Wednesday, 11 January 2017

Second practice run- SOCIAL CHALLENGE


The second practice run allowed us a s a team work collaboratively, we allocated our roles however there were technical difficulties that were an issue. For example the equipment, we will be needing 3 headphones and a forth iPad for the vision mixing.
The lighting and the sound is important as it needs to be in time with Tim who is the host, we will also need to arrange a TV set up for the background.
The shooting script was an issue as the camera operators were not prepared, however we managed to find the shot list which was an alternative to this situation.

No comments:

Post a Comment