Wednesday, 25 January 2017

Final practice run through- SOCIAL CHALLENGE

The final practice run went extremely well, we allocated our roles within our groups and performed them to a professional standard. We set up our equipment, and were organised with our scripts and teleprompter on the TV screen for the host to look at.

One of our team members Chai-ann did not attend this final practice run, and her role was; teleprompter, as she was not in I covered for this role and managed both jobs which were floor manager and Teleprompter.

Overall the director in the control room and I worked well together and communicated well with the camera operators and everyone in the studio.


No comments:

Post a Comment