Monday, 28 November 2016

Set design


Week 7

Week 7 - 28/11/16 9:00am
This morning as a group we discussed deadlines and how it could be complete by Wednesday 30th . Berfin ask anyone who needed help or support with their pre-production and distribute any work between Victor, Maarya and Berfin as they are done.
Lighting Plan - Berfin
Set Design & Proplist - Dani
Secondary Research - Dani

Week 6

Week 6 - 15/11/16 10:20am
In this reporting meeting, we spoke about what had to be done and when.
Tasks that needs to be completed
Dani - Props list and set design( Including logos) & Secondary Research Evidence
Keeley- Primary Research Evidence , script
Victor -   Shooting- Camera Script
Chai-ann- Production Schedule & Shooting- Camera Script
Timi - Linking and inserts, script
Zak- Shot list, Logo
Abigail - Production Schedule, Lighting Plan

Week 5

Week 5 - 14/11/16 9:00am
This morning we discussed what was complete for the pre-production.For an example, Berfin, Victor, Zak and Maarya was done with their individual task and started to work with other. Another example, Berfin is starting and designing the logo with Zak.
Complete Pre-production
Berfin  - Budget & Reece
Victor - Equipment & Reece
Maarya - Storyboard
Zak - Studio Floor Plan

Equipment Checklist



Recce



Wednesday, 9 November 2016

Diary

Today in class I spoke to Zak about the shot list i then took a picture and have now started on my storyboard.

Week 4

Week 4 - 09/11/16 11.10am
Today we discuss the main part of the pre-production as we had a deadline on the 14th of November. Everyone team member given a little update where they were on the pre-production.
Storyboard
Equipment check
Research evidence
Location recce

Week 3

Week 3 - 08/11/16 11.40am
This week we decided as a group to give out individu
al task.
Dani - Props list and set design( Including logos) & Secondary  Research Evidence
Berfin - Budget & Regular Production Meeting (Regular blog post), Reece
Keeley- Primary Research Evidence , script
Victor -   Shooting- Camera Script, Equipment checklist , Reece
Maarya- Storyboard & Risk assessments
Chai-ann- Production Schedule & Shooting- Camera Script
Timi -Linking and inserts, script
Zak- Shot list, Studio floor plans
Abigail - Production Schedule, Lighting Plan 

Meetings week 2

Week 2 - 02/11/16 10:20am
We had our second meeting where we discuss our TV show and the different types of close we can use and includes in our show. For an example,we liked the idea of having close up of the iPad in the show and most likely we will need to pre-record these clips and insert them on the production day.

Meetings

Week 1 -31/10/16 10:20am






This was our first meeting as a group. We discussed what the content of the show was and how we can set up the TV room for it. Overall, we plan what each role was and what had to be done for it.
ourced from Keeley’s Blogger
my idea is to use social media to create a game show, there will be two teams of three and each team will compete to create funny and creative images and videos using social sites such as snapchat, tumblr and music.ly. the ages will range from 15-25 and the watershed will be from 9:30pm.

Job roles






Date & Time
Discussion and Topic of the meeting
Week 1 -08/11/16 10:20






This week we decided as a group to give out individual task.
Dani - Props list and set design( Including logos) & Primary Research Evidence
Berfin - Budget & Regular Production Meeting (Regular blog post),
Dimitar - Studio floor plans
Keeley- Secondary Research Evidence , Linking and inserts, script  
Victor -   Shooting- Camera Script, Equipment checklist 
Maarya- Storyboard & Risk assessments
Chai-ann- Production Schedule & Shooting- Camera Script 
Timi - Location Recce
Zak- Shot list
Abigail - Production Schedule, Lighting Plan 

Tuesday, 8 November 2016

Meetings

In our most current meetings we put our emails on a piece of paper, where Keely then added us to a project folder on Google slides, this allows us to individually post and also access all the pre production documentations that our group puts up. After this we made a start on our pre production roles.

Meetings



In our group we updated the roles in our groups in order to equally share out the work, I still had the same roles which were the storyboard and the Risk assessment, However Dimitar isn't in our group anymore therefore i will need to consult with Dani who is now the set designer for the risk assessment.


First day in the studio

The first day in the studio went well as we learnt to familiarise ourselves with the equipment, space, and the different roles in the control room and on the set. Tom the technician gave us a description of the equipment and what it was used for, for example we learnt how to operate the cameras and how to utilise the visual mixer in the control room. We then allocated roles in side the control room and also on the set.

Tom handed me headphones with a mic, where i also had a device in which i was able to change the volume,  my role on set was the floor manager, which i think i handled well as i was able to multitask by talking to the people in the control room as well as sending information back to the production crew on set.
I had to work closely with Berfin, Timmy, and Jacira who were camera operators, i needed to ensure that the shots that the director (Tim) in the control wanted, was being taken. I had to work closely especially with Jacira as she did not have any access to headphones, so she wasn't able to hear anything in the control room , my role was to tell her to switch to different shots. 

when switching roles in the control room my job role was to help my team member on the sound and visual mixer, i felt that i was more effective working as the floor manager, as i didn't really do anything in the control room.