Week 9 - 12/12/16 9:00am
|
Keeley has finally completed the
script and as a group we reviewed it. We discussed the teams and who should
be in what team. We also thought about the different type of commercials that
we can. Our final choice was Musical.ly Ad. Berfin came up with the idea of
adding a 10 second of thought from each other after the first round. Zak also
had the idea of adding see you after break.
Team One
Dianni
Jacira
Lucy
Team Two
Daisy
Dimitar
Nat
Host
Timmy
|
Tuesday, 13 December 2016
Week 9
Wednesday, 7 December 2016
Week 8
Week 8 - 07/12/16 11:40am
|
Finally, the script has been
completed so as group we read and discussed the script and the error that has
been made. As the script was really short half of the team was confused so we
decided to make a point system and finalised the three games included in the
show. We also discussed our job roles in the production.
Director - Dani
Vision Mixer - Berfin
Floor Manager - Maarya
Cam 1 - Timi
Cam 2 (Main)- Vic
Cam 3 - Abi
Sound - Zak
Lighting - Chai ann
Tech/Monitor - Keeley
The script needs a lot of work eg - structure of rounds
Round 1 - Meme Challenge (3 rounds of images/video create
a meme for then upload to instagram for likes, most likes wins)
Round 2 - Snapchat Stories (60 second story using
selected theme, filters. Audience pick most funny - watch on phones/TV
MONITOR)
Round 3 - Music.ly challenge both teams create 30 sec vid
of the themed song 'All I Want For Christmas' Mariah Carey. Voting is the
same.
System
Point - By Likes on social media
Three
games - Memes, Musically, Snapchat Filter.
|
Tuesday, 6 December 2016
Progress
Dear diary
Today as a group we had a discussion on the script, we also chose the three songs that would be played during our Social Challenge. There were disputes to what the whole concept around the Social Challenge game was about. We managed to find alternative game solutions and come to a conclusion.
Monday, 5 December 2016
Tuesday, 29 November 2016
Monday, 28 November 2016
Week 7
Week 7 - 28/11/16 9:00am
|
This morning as a group we
discussed deadlines and how it could be complete by Wednesday 30th . Berfin
ask anyone who needed help or support with their pre-production and
distribute any work between Victor, Maarya and Berfin as they are done.
Lighting
Plan - Berfin
Set
Design & Proplist - Dani
Secondary
Research - Dani
|
Week 6
Week 6 - 15/11/16 10:20am
|
In this reporting meeting, we
spoke about what had to be done and when.
Tasks that needs to be completed
Dani - Props list and set design( Including logos)
& Secondary Research Evidence
Keeley-
Primary Research Evidence , script
Victor
- Shooting- Camera Script
Chai-ann-
Production Schedule & Shooting-
Camera Script
Timi
- Linking and inserts, script
Zak-
Shot list, Logo
Abigail - Production Schedule, Lighting Plan
|
Week 5
Week 5 - 14/11/16 9:00am
|
This morning we discussed what
was complete for the pre-production.For an example, Berfin, Victor, Zak and
Maarya was done with their individual task and started to work with other.
Another example, Berfin is starting and designing the logo with Zak.
Complete Pre-production
Berfin - Budget & Reece
Victor
- Equipment & Reece
Maarya
- Storyboard
Zak -
Studio Floor Plan
|
Wednesday, 23 November 2016
Monday, 21 November 2016
Wednesday, 16 November 2016
Monday, 14 November 2016
Wednesday, 9 November 2016
Diary
Today in class I spoke to Zak about the shot list i then took a picture and have now started on my storyboard.
Week 4
Week 4 - 09/11/16 11.10am
|
Today we discuss the main part of
the pre-production as we had a deadline on the 14th of November. Everyone
team member given a little update where they were on the pre-production.
Storyboard
Equipment
check
Research
evidence
Location
recce
|
Week 3
Week 3 - 08/11/16 11.40am
|
This week we decided as a group to give out individu
al task.
Dani - Props list and set design( Including logos) & Secondary Research Evidence Berfin - Budget & Regular Production Meeting (Regular blog post), Reece Keeley- Primary Research Evidence , script Victor - Shooting- Camera Script, Equipment checklist , Reece Maarya- Storyboard & Risk assessments Chai-ann- Production Schedule & Shooting- Camera Script Timi -Linking and inserts, script Zak- Shot list, Studio floor plans Abigail - Production Schedule, Lighting Plan |
Meetings week 2
Week 2 - 02/11/16 10:20am
|
We had our second
meeting where we discuss our TV show and the different types of close we can
use and includes in our show. For an example,we liked the idea of having
close up of the iPad in the show and most likely we will need to pre-record
these clips and insert them on the production day.
|
Meetings
Week 1 -31/10/16 10:20am
|
This was our first
meeting as a group. We discussed what the content of the show was and how we
can set up the TV room for it. Overall, we plan what each role was and what
had to be done for it.
ourced from Keeley’s
Blogger
my idea is to use social media to create
a game show, there will be two teams of three and each team will compete to
create funny and creative images and videos using social sites such as
snapchat, tumblr and music.ly. the ages will range from 15-25 and the
watershed will be from 9:30pm.
|
Job roles
Date & Time
|
Discussion and Topic of the meeting
|
Week 1 -08/11/16 10:20
|
This week we decided as a group to give out individual task.
Dani - Props list and set design( Including logos) & Primary Research Evidence
Berfin - Budget & Regular Production Meeting (Regular blog post),
Dimitar - Studio floor plans
Keeley- Secondary Research Evidence , Linking and inserts, script
Victor - Shooting- Camera Script, Equipment checklist
Maarya- Storyboard & Risk assessments
Chai-ann- Production Schedule & Shooting- Camera Script
Timi - Location Recce
Zak- Shot list
Abigail - Production Schedule, Lighting Plan
|
Tuesday, 8 November 2016
Meetings
In our most current meetings we put our emails on a piece of paper, where Keely then added us to a project folder on Google slides, this allows us to individually post and also access all the pre production documentations that our group puts up. After this we made a start on our pre production roles.
Meetings
In our group we updated the roles in our groups in order to equally share out the work, I still had the same roles which were the storyboard and the Risk assessment, However Dimitar isn't in our group anymore therefore i will need to consult with Dani who is now the set designer for the risk assessment.
First day in the studio
The first day in the studio went well as we learnt to familiarise ourselves with the equipment, space, and the different roles in the control room and on the set. Tom the technician gave us a description of the equipment and what it was used for, for example we learnt how to operate the cameras and how to utilise the visual mixer in the control room. We then allocated roles in side the control room and also on the set.
Tom handed me headphones with a mic, where i also had a device in which i was able to change the volume, my role on set was the floor manager, which i think i handled well as i was able to multitask by talking to the people in the control room as well as sending information back to the production crew on set.
I had to work closely with Berfin, Timmy, and Jacira who were camera operators, i needed to ensure that the shots that the director (Tim) in the control wanted, was being taken. I had to work closely especially with Jacira as she did not have any access to headphones, so she wasn't able to hear anything in the control room , my role was to tell her to switch to different shots.
I had to work closely with Berfin, Timmy, and Jacira who were camera operators, i needed to ensure that the shots that the director (Tim) in the control wanted, was being taken. I had to work closely especially with Jacira as she did not have any access to headphones, so she wasn't able to hear anything in the control room , my role was to tell her to switch to different shots.
when switching roles in the control room my job role was to help my team member on the sound and visual mixer, i felt that i was more effective working as the floor manager, as i didn't really do anything in the control room.
Monday, 31 October 2016
First meeting
In our first group meeting we allocated roles within our group and shared out the tasks accordingly. My role is to complete a risk assessment and produce a storyboard, i will need to work alongside with Zak as he is producing the shot list, also when completing the risk assessment i will need to liaise with Dimitar who is the set designer in order to know where the props are set on the stage. This will enable me to find out the possible risks.
Tuesday, 11 October 2016
Pitch Ideas- Sound Buzz
My production idea is mainly based around a game show, the name of the production is `Sound Buzz' this name was conducted from the initial idea of game show.
The game consists of two family and friends separated in groups of 6, one of the components wear headphones where they listen to a verse of a song. The same person has to explain to the other players of what song and artist they are talking about, however they are not allowed to talk and need to act out the song whilst the other players try to guess what that person is trying to say.
when the teams have figured out the song they have to press a buzzer, and whichever team presses the buzzer first, they win that round.
The target audience for this production would be mostly families and teenagers. There will be no music which has abuse language.
Monday, 26 September 2016
Subscribe to:
Posts (Atom)